PLC is used as the control unit, and the host computer software is used to flexibly control the load output. When in use, the jog control can
be performed through the host computer monitoring screen. At the same time, the timing function of the software can be used to achieve
"unattended" work, which improves the intelligence of the product and can adapt to various complex application scenarios. It can be
connected to the central control to achieve centralized management
*Equipped with all-round electrical protection measures such as overcurrent, short circuit, open circuit, overload, surge, etc.
*It has multiple control methods such as physical buttons, handheld remote control, computer remote control, etc., which are fast and
convenient. The physical buttons and handheld remote control can only power on and off the entire power box at the same time. The
handheld remote control can control up to 800 meters in an open distance.
*With single-unit and cluster management functions, it adopts multiple remote communication ports such as RS485 wired Ethernet, and can
be controlled by any computer in the local area network;
*It can set 4 groups of switch time, support the function of power on and off at scheduled time every day, and the system will automatically
cycle after setting, meeting the management needs of different occasions;
*It can realize real-time temperature and humidity monitoring, real-time smoke monitoring, and automatic power off in case of high
temperature, high humidity and smoke alarm through PLC software;
*After the alarm is triggered, the computer will automatically force a pop-up screen prompt, the PLC module and computer buzzer will sound
for a long time, and other alarm methods;
*It can power on and off the entire relay circuit, and can also control the power on and off of each contactor individually through PLC
software;
*Built-in lightning arrester, with lightning protection function, Class B lightning protection;
*Built-in 10A-16A spare three-hole universal socket;